Migrate All GPO from Test Lab (2008) to Production server (2012)


hello

i have gpos in test environment (server 2008) , wants transfer gpos production server (server 2012)

there no trust between them , domains different.

pls me how can transfer gpos real server (2008 2012).

thanx

hi,

thanks post.

based on experience, key challenge when migrating group policy objects (gpos) 1 domain or forest information in gpo specific domain or forest gpo defined. when transferring gpo new domain or forest, may not desirable, or possible, use same settings. can use migration table reference users, groups, computers, , unc paths in source gpo new values in destination gpo.

work migration tables

http://technet.microsoft.com/en-us/library/cc754682.aspx

besides, following blog provides method of migrating gpos via powershell:

three steps migrate group policy between active directory domains or forests using powershell

http://blogs.technet.com/b/ashleymcglone/archive/2014/04/28/three-steps-to-migrate-group-policy-with-powershell.aspx

similar thread reference:

gpo migration test production

https://social.technet.microsoft.com/forums/windowsserver/en-us/e4c0e69f-d5b3-4896-809d-71fb3caa8c64/gpo-migration-from-test-to-production?forum=winservergp

best regards,

alvin wang


please remember mark replies answers if , un-mark them if provide no help. if have feedback technet subscriber support, contact tnmff@microsoft.com.



Windows Server  >  Migration



Comments

Popular posts from this blog

WIMMount (HSM) causing cluster storage to go redirected (2012r2 DC)

Failed to delete the test record dcdiag-test-record in zone test.com

Azure MFA with Azure AD and RDS