Migrate All GPO from Test Lab (2008) to Production server (2012)
hello
i have gpos in test environment (server 2008) , wants transfer gpos production server (server 2012)
there no trust between them , domains different.
pls me how can transfer gpos real server (2008 2012).
thanx
hi,
thanks post.
based on experience, key challenge when migrating group policy objects (gpos) 1 domain or forest information in gpo specific domain or forest gpo defined. when transferring gpo new domain or forest, may not desirable, or possible, use same settings. can use migration table reference users, groups, computers, , unc paths in source gpo new values in destination gpo.
work migration tables
http://technet.microsoft.com/en-us/library/cc754682.aspx
besides, following blog provides method of migrating gpos via powershell:
three steps migrate group policy between active directory domains or forests using powershell
similar thread reference:
gpo migration test production
best regards,
alvin wang
please remember mark replies answers if , un-mark them if provide no help. if have feedback technet subscriber support, contact tnmff@microsoft.com.
Windows Server > Migration
Comments
Post a Comment